Project
Construction of two 330 kV transmission lines (3 km) from Agcabedi substation, one 110 kV double circuit transmission line (47 km) Agcabedi-Barda, construction of Agcabedi 330/110 kV substation, extension of existing 330 kV Asgres substation and of existing Barda 110 kV substation.
Financed by European Bank for Reconstraction and Development, EBRD.