500 kV OHTL Power Interconnection Project and annexed converting Stations, 1,100 Km – Ethiopia-Kenya
Home > Transmission and Distribution > 500 kV OHTL Power Interconnection Project and annexed converting Stations, 1,100 Km – Ethiopia-Kenya
Location -Ethiopia, Kenya
Project
The Project, linking the Ethiopia and Kenya power systems, will be the anchor for the development of the Eastern Africa Power Pool (EAPP), together with, the Ethiopia-Djibouti, the on-going Ethiopia-Sudan and Kenya-Uganda interconnections and the planned Kenya-Tanzania interconnection. It will also form the backbone regional transmission network, which will integrate the eastern, central and southern African power systems.
Transmission Lines HVDC 500 kV (433 km – 2 lots), No. 1 Converting stations (1,000 MW)
Transmission Lines HVDC 500 kV (612 km – 3 lots), No. 1 Converting stations (1,000 MW).
Financed by African Development Bank, AfDB.
Client
Ethiopian Electric Power ,EEP
Kenya Electricity Transmission Company Limited , KETRACO.
Services
Project Management
Design Review
Contract’s Administration
Certification of Invoices
Environmental and Social Studies (ESIA/RAP/LRP)
Bidding Documents and Construction Supervision on Site