Installed capacity 670 MW. Main Powerhouse with 600 MW installed capacity (4×150 MW Francis Turbines) and Dam Toe Powerhouse with 70 MW capacity (2×35 MW). Dam is a concrete-faced rockfill dam 220 m high. The reservoir is 1.5 billion m³. The main headrace tunnel feeding Main Powerhouse is 14 Km long with 8.3 m of inner diameter and will be excavated by TBM.
Financed byAsian Development Bank, ADB.
Client
Nepal Electricity Authority, NEA
Services
Update Feasibility Study and Detailed Design (Civil and Electromechanical works)
Cost Estimate and Construction Implementation Schedule
Dam Safety
Bidding Documents divided in four lots (Civil, Electro-Mechanical and Transmission Line) adopting Emerald and Yellow Book