Aluto Geothermal Resorces Development Project – Ethiopia

Home > Geothermal Energy > Aluto Geothermal Resorces Development Project – Ethiopia

Project

Development of geothermal resources in Aluto (site to confirm the 35 MW potential).
Assessment of the 35 MW potential for the adjoining Bobessa geothermal area.
Drilling up to 12 wells to enhance the production and reinjection requirements for Aluto and Bobesa assessment.
Construction of infrastructures facilities.
Financed by World Bank, WB.

Client

Ethiopian Electric Power, EEP

Services

  • Review of Detailed Design for Infrastructure Works
  • Preparation of Tender Documents for Civil Works and Drilling Contractor
  • Assistance to Client in Bid Evaluation and Contract Negotiation
  • Supervision during Implementation of Civil Works
  • Supervision during Drilling and Well Testing Operations
  • Geoscientific Assistance and Follow-up during Drilling and Testing Operations
  • Contractors’ ESHS Compliance Monitoring
  • Reservoir Engineering Studies
  • Environmental and Social Studies
  • Transfer of Knowledge
  • Economic-Financial Analysis
  • Overall Project Management
  • Transfer of Knowledge to Client’s Staff

Status

Completed

You cannot copy content of this page.