Installed Capacity of 110 MW (2×55 MW Steam Turbines)
Around 20,000 meters of steam gathering and reinjection pipeline installation.
Financed by Japan International Cooperation Agency, JICA.
Client
Pertamina Geothermal Energy, PGE
Services
Preparation of Bidding Documents and Front-End Engineering Design
Assistance during Bid Evaluation and Contract Negotiation