Dudhkoshi Hydropower Project, 670 MW – Nepal

Home > Hydropower and Dams > Dudhkoshi Hydropower Project, 670 MW – Nepal

Project

Installed capacity 670 MW. Main Powerhouse with 600 MW installed capacity (4×150 MW Francis Turbines) and Dam Toe Powerhouse with 70 MW capacity (2×35 MW). Dam is a concrete-faced rockfill dam 220 m high. The reservoir is 1.5 billion m³. The main headrace tunnel feeding Main Powerhouse is 14 Km long with 8.3 m of inner diameter and will be excavated by TBM.
Financed byAsian Development Bank, ADB.

Client

Nepal Electricity Authority, NEA

Services

  • Update Feasibility Study and Detailed Design (Civil and Electromechanical works)
  • Cost Estimate and Construction Implementation Schedule
  • Dam Safety
  • Bidding Documents divided in four lots (Civil, Electro-Mechanical and Transmission Line) adopting Emerald and Yellow Book
  • Detailed Design of 400kV Transmission Line, 95km
  • ESIA of Hydropower complex
  • IEE of 400 kV Transmission Line
  • Transfer of Knowledge to Client’s Staff

Status

In Progress