Installed capacity 670 MW. Main Powerhouse with 600 MW installed capacity (4×150 MW Francis Turbines) and Dam Toe Powerhouse with 70 MW capacity (2×35 MW). Dam is a concrete-faced rockfill dam 220 m high. The reservoir is 1.5 billion m³. The main headrace tunnel feeding Main Powerhouse is 14 Km long with 8.3 m of inner diameter and will be excavated by TBM.
Financed byAsian Development Bank, ADB.
ELC Electroconsult S.p.A. is a private and independent Italian engineering consultancy company operating in Hydropower and Dams, Geothermal, Transmission and Distribution, Environmental and Capacity Building sectors.
Via Marostica, 1
20146 - Milan - Italy
info@elc-electroconsult.com
Phone: +39 02 4953 8450
© 2025 ELC Electroconsult S.p.A. – Via Marostica, 1 – 20146 – Milan – Italy – P.Iva & C.F. 06813070965 – All rights reserved – Cookie Policy – Privacy Policy
You cannot copy content of this page.