Favazzina Sea Water Pumping Plant Station, 300 MW, – Italy

Home > Hydropower and Dams > Favazzina Sea Water Pumping Plant Station, 300 MW, – Italy

Project

Installed capacity 300 MW (2×150 MW reversible Francis Turbines).
Financed by TERNA.

Client

TERNA SpA

Services

  • Technical and Economic Feasibility Study of the Reversible Sea Water Pumping Plant
  • Critical Examination of the Investigations executed by ISMES
  • Study of Alternatives and Selection of the most attractive design Project
  • Definition of the Final layout and preparation of the Feasibility Study Drawings
  • Construction Methodology
  • Cost Estimate
  • Implementation Schedule
  • Economic Analysis
  • Transfer of Knowledge to Client’s Staff

Status

Completed