The Kumbih-03 Hydroelectric Power Project is a medium sized hydroelectric run-of-the river plant with total installed capacity of 45 MW. The plant will generate approximately 205.5 GWh/year. The Project works comprise a 31 m high concrete dam impounding a reservoir of 300,000 m3, power waterways including an intake, a 5,8 km long headrace tunnel, a surge shaft, an underground penstock, a surface powerhouse housing no. 3 Francis turbine units and a 150 kV switchyard for the tie-in connection with the existing Sidikalang-Subulussalam transmission line.
Financed by Kreditanstalt für Wiederaufbau, KFW.
Client
PT. PLN Persero
Services
Update of Feasibility Study
Detailed Design
Pre-Qualification Documents
Tender Documents
Construction Supervision
Environmental and Social Impact Assessment (ESIA)
Land Acquisition and Resettlement Action Plan (LARAP)
Environmental Flow Assessment (EFA)
Critical Habitat Assessment (CHA) and Biodiversity Action plan (BAP)