The Kumbih-03 Hydroelectric Power Project is a medium sized hydroelectric run-of-the river plant with total installed capacity of 45 MW. The plant will generate approximately 205.5 GWh/year. The Project works comprise a 31 m high concrete dam impounding a reservoir of 300,000 m3, power waterways including an intake, a 5,8 km long headrace tunnel, a surge shaft, an underground penstock, a surface powerhouse housing no. 3 Francis turbine units and a 150 kV switchyard for the tie-in connection with the existing Sidikalang-Subulussalam transmission line.
Financed by Kreditanstalt für Wiederaufbau, KFW.
ELC Electroconsult S.p.A. is a private and independent Italian engineering consultancy company operating in Hydropower and Dams, Geothermal, Transmission and Distribution, Environmental and Capacity Building sectors.
Via Marostica, 1
20146 - Milan - Italy
info@elc-electroconsult.com
Phone: +39 02 4953 8450
© 2025 ELC Electroconsult S.p.A. – Via Marostica, 1 – 20146 – Milan – Italy – P.Iva & C.F. 06813070965 – All rights reserved – Cookie Policy – Privacy Policy
You cannot copy content of this page.