Installed capacity 900 MW (4×225 MW Francis reversible pump-turbine units); RCC Upper dam 81 m high, CFRD Lower dam 55 m high; No.2 power waterways 3 Km long with upstream and downstream surge tanks; underground powerhouse; 500 kV outdoor switchyard and 500 kV transmission line.
Financed by World Bank, WB.
Client
PT PLN Persero
Services
Pre-Feasibility Study Update
Feasibility Study
Topographic survey.
Geological and geomechanical investigations.
Environmental and Social Studies.
Hydromechanical and Electromechanical Design.
Civil works.
Economic and Financial Analysis.
The study of the Transmission Line and the impact on the National Grid Network, in order to identify the optimal connection to the grid.