Mudi Dam and Water Treatment Plant – Malawi

Home > Hydropower and Dams > Mudi Dam and Water Treatment Plant – Malawi

Project

Mudi Dam and its associated water treatment facilities represent a crucial component of Blantyre’s water supply system. However, the dam and water treatment plant have deteriorated significantly since teir construction in the 1950s. Mudi Dam is a zoned earth embankment dam, 15 m hight, with a gated spillway on the left bank. Reservoir capacity is 1.5 milion m3. Catchment area is 8.9 Km2.

Client

Blantyre Water Board,BWB.

Services

  • Analysis of existing Dam Safety Reviews
  • Dam inspection
  • Preparation of Construction Supervision and Quality Assurance Plan
  • Preparation of Instrumentation Plan
  • Preparation of Operation & Maintenance Plan
  • Preparation of Emergency Preparedness Plan
  • Participation in the design of dam rehabilitation works
  • Transfer of Knowledge to Client’s Staff.

Status

In Progress