World’s highest rockfill dam 335 m;
Installed capacity of 3,780 MW (6×630 MW Francis turbines);
Six independent power waterways 460 to 570 m long;
Underground powerhouse 20 m long, 70 m high and 25 m wide;
Four diversion tunnels;
Total spillway capacity of 6,900 m³/s through four independent spillways.
ELC Electroconsult S.p.A. is a private and independent Italian engineering consultancy company operating in Hydropower and Dams, Geothermal, Transmission and Distribution, Environmental and Capacity Building sectors.
Via Marostica, 1
20146 - Milan - Italy
info@elc-electroconsult.com
Phone: +39 02 4953 8450
© 2025 ELC Electroconsult S.p.A. – Via Marostica, 1 – 20146 – Milan – Italy – P.Iva & C.F. 06813070965 – All rights reserved – Cookie Policy – Privacy Policy
You cannot copy content of this page.