500 kV Power Interconnection Project Java – Bali – Indonesia

Home > Transmission and Distribution > 500 kV Power Interconnection Project Java – Bali – Indonesia

Project

Extension of the existing 500 kV Paiton substation in East Java comprising two new 500 kV transmission line circuits and two 50 MVAR switching reactors. Construction of a 500 kV double circuit transmission line (10 km long) through the Bali Barat National Park from Segara Rupek to Gilimanuk, a 75 km 500 kV transmission line (75 km long) in Bali from Gilimanuk to New Kapal Antosari. Construction of a new 500/150 kV distribution substation at New Kapal (Antosari) in Bali and upgrading of eleven 150 kV substations in Java and Bali.
Financed by Asian Dvelopment Bank, ADB.

Client

Perusahaan Listrik Negara , PLN.

Services

  • Environmental and Social Studies (ESIA/LARAP)
  • Capacity Building
  • Bidding Documents
  • Construction Supervision
  • Transfer of Knowledge to Client’s Staff

Status

In Operation