Extension of the existing 500 kV Paiton substation in East Java comprising two new 500 kV transmission line circuits and two 50 MVAR switching reactors. Construction of a 500 kV double circuit transmission line (10 km long) through the Bali Barat National Park from Segara Rupek to Gilimanuk, a 75 km 500 kV transmission line (75 km long) in Bali from Gilimanuk to New Kapal Antosari. Construction of a new 500/150 kV distribution substation at New Kapal (Antosari) in Bali and upgrading of eleven 150 kV substations in Java and Bali.
Financed by Asian Dvelopment Bank, ADB.
ELC Electroconsult S.p.A. is a private and independent Italian engineering consultancy company operating in Hydropower and Dams, Geothermal, Transmission and Distribution, Environmental and Capacity Building sectors.
Via Marostica, 1
20146 - Milan - Italy
info@elc-electroconsult.com
Phone: +39 02 4953 8450
© 2025 ELC Electroconsult S.p.A. – Via Marostica, 1 – 20146 – Milan – Italy – P.Iva & C.F. 06813070965 – All rights reserved – Cookie Policy – Privacy Policy
You cannot copy content of this page.