Extension of the existing 500 kV Paiton substation in East Java comprising two new 500 kV transmission line circuits and two 50 MVAR switching reactors. Construction of a 500 kV double circuit transmission line (10 km long) through the Bali Barat National Park from Segara Rupek to Gilimanuk, a 75 km 500 kV transmission line (75 km long) in Bali from Gilimanuk to New Kapal Antosari. Construction of a new 500/150 kV distribution substation at New Kapal (Antosari) in Bali and upgrading of eleven 150 kV substations in Java and Bali.
Financed by Asian Dvelopment Bank, ADB.