Study of the 400 kV transmission lines and 400 kV substations in East Nepal, including Arun Hub-Inaruwa TL (100 km), Tingla-Dudhkoshi HPP TL (35 km), Arun Hub-Tingla HPP TL (60 km), Inaruwa-Anarmani TL (about 125 km) transmission lines and Sitalpati (Arun Hub), Inaruwa, north of Inaruwa substations.
Financed by International Development Association, IDA.
ELC Electroconsult S.p.A. is a private and independent Italian engineering consultancy company operating in Hydropower and Dams, Geothermal, Transmission and Distribution, Environmental and Capacity Building sectors.