The Project, linking the Ethiopia and Kenya power systems, will be the anchor for the development of the Eastern Africa Power Pool (EAPP), together with, the Ethiopia-Djibouti, the on-going Ethiopia-Sudan and Kenya-Uganda interconnections and the planned Kenya-Tanzania interconnection. It will also form the backbone regional transmission network, which will integrate the eastern, central and southern African power systems.
Transmission Lines HVDC 500 kV (433 km – 2 lots), No. 1 Converting stations (1,000 MW)
Transmission Lines HVDC 500 kV (612 km – 3 lots), No. 1 Converting stations (1,000 MW).
Financed by African Development Bank, AfDB.
ELC Electroconsult S.p.A. is a private and independent Italian engineering consultancy company operating in Hydropower and Dams, Geothermal, Transmission and Distribution, Environmental and Capacity Building sectors.
Via Marostica, 1
20146 - Milan - Italy
info@elc-electroconsult.com
Phone: +39 02 4953 8450
© 2025 ELC Electroconsult S.p.A. – Via Marostica, 1 – 20146 – Milan – Italy – P.Iva & C.F. 06813070965 – All rights reserved – Cookie Policy – Privacy Policy
You cannot copy content of this page.